Skip to Main Content
U.S. flag

An official website of the United States government


Profile Information

Government
176284
71 Main Street Porter, ME 04068
5.5
Map U2, Lot 98
43.8116412 / -70.8828512
2
Gardner, Frank
Gardner.Frank@epa.gov
617-918-1278


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
Regional Planning Commission Inc. Southern MaineBF96174701MEAssessment2013


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Phase I Environmental Assessment$3,000.0006/02/201408/20/2014Regional Planning Commission Inc. Southern MaineYFY15
Supplemental Assessment$8,972.0008/25/201412/30/2015Regional Planning Commission Inc. Southern MaineN
Supplemental Assessment$2,500.0008/01/2014Regional Planning Commission Inc. Southern MaineN


Is Cleanup Necessary? Yes
EPA Assessment Funding: $14,472.00
Leveraged Funding:
Total Funding: $14,472.00


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media


Asbestos
Lead
NOT Cleaned up
NOT Cleaned up
Building Materials
NOT Cleaned up

Cleanup Activities

Start DateEPA FundingCompletion DateCAAccomplishment Counted?Cleanup Documentation
03/01/2017Regional Planning Commission Inc. Southern MaineNo


Cleanup/Treatment Implemented:
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: 5.5
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding:
Leveraged Funding: $572,190.00
Cost Share Funding:
Total Funding: $572,190.00


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls



Top of Page


Redevelopment and Other Leveraged Accomplishments

There are no current redevelopment activities.


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

Former Use: The Site is improved with a single structure (the Site building), which consists of two interconnected building sections covering a total approximate footprint of 5,500 square feet. The original section was constructed in 1919, and is a two-story wood-d structure with a full finished basement, constructed on a brick and poured concrete foundation. The �new� section was added circa 1960, and is a one-story wood-d structure, constructed on a poured concrete slab-on-grade foundation. The first floor of the original section is utilized as municipal offices for the Town of Porter, as well as adult education classrooms and administrative offices. The second floor is mostly empty space, with areas of file storage. The one-story addition is referred to as the Community Center, and is utilized for public gathering/ meeting space, and was previously used as a Headstart child care facility. Based on available information, the Site consisted of undeveloped land prior to construction of the Site building in 1919. It was operated as a public school for the Town of Porter from 1919 until 1985, at which time it was granted from the local School Administrative District to the Town of Porter. The Site building has reportedly been owned by the Town and used as Porter Town Hall since 1985.
Commercial (5.5)
Hazardous


Top of Page