Skip to Main Content
U.S. flag

An official website of the United States government


Profile Information

201741
59 Elm Street Biddeford, ME 04005
3.54
Tax Map 40, Lot 56
43.4972225 / -70.4557017
1
Gardner, Frank
Gardner.Frank@epa.gov
617-918-1278


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
Regional Planning Commission Inc. Southern MaineBF96174701MEAssessment2013
Southern Maine Planning and Development CommissionBF00A00458MEAssessment2018
Southern Maine Regional Planning CommissionBF97178501MEBCRLF2007


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Cleanup Planning$3,500.0012/08/2020Southern Maine Planning and Development CommissionN
Phase I Environmental Assessment$3,500.0006/23/201509/14/2015Regional Planning Commission Inc. Southern MaineYFY16
Phase I Environmental Assessment$3,500.0011/02/202012/08/2020Southern Maine Planning and Development CommissionN


Is Cleanup Necessary? Unknown
EPA Assessment Funding: $10,500.00
Leveraged Funding:
Total Funding: $10,500.00


Top of Page


Climate Adaption and Mitigation - Planning or Assessment

There is no data for Climate Adaption and Mitigation - Planning or Assessment.


Top of Page


Contaminants and Media


Arsenic
Asbestos
Lead
Other Contaminants
Other Metals
PAHS
Petroleum Products
SVOCs
VOCs
Cleaned Up
Cleaned Up
Cleaned Up
Cleaned Up
Cleaned Up
Cleaned Up
Cleaned Up
Cleaned Up
Cleaned Up
Building Materials
Soil
Cleaned Up
Cleaned Up

Cleanup Activities

Start DateEPA FundingCompletion DateCAAccomplishment Counted?Cleanup Documentation
01/01/2021Southern Maine Regional Planning CommissionNo
01/01/2021$300,000.00Southern Maine Regional Planning CommissionNo


Cleanup/Treatment Implemented: Y
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info: Installation of MEDEP-approved soil cover systems over impacted soils and urban fill materials.
Address of Data Source:
Total ACRES Cleaned Up: 3.54
Number of Cleanup Jobs Leveraged: 4
EPA Cleanup Funding: $300,000.00
Leveraged Funding:
Cost Share Funding: $60,000.00
Total Funding: $360,000.00


Top of Page


Climate Adaption and Mitigation - Demolition or Cleanup

There is no data for Climate Adaption and Mitigation - Demolition or Cleanup.


Top of Page


Institutional and Engineering Controls

Yes
Information Devices
Yes
Cover Technologies (e.g., Capping)
Installation of MEDEP-approved soil cover systems over impacted soils and urban fill materials.


Top of Page


Redevelopment and Other Leveraged Accomplishments

There are no current redevelopment activities.


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Climate Adaption and Mitigation - Redevelopment

There is no data for Climate Adaption and Mitigation – Redevelopment


Top of Page


Additional Property Attributes

Phase II ESA recommended.

Former Use: The Site is currently improved with three buildings. The Mill Building and Warehouse Building are currently being utilized for miscellaneous storage purposes while the Auto Service Building is currently occupied by Quality Auto Care and utilized as an automotive repair facility. A former Saco & Pettee Machine Shop building was destroyed by fire in 1963. The Site consisted of undeveloped land prior to circa 1830 along the Saco River. During the mid-to-late 1800s, the Site was improved with approximately 10 residential dwellings/tenements and a lumber yard. Industrial development at the Site began circa 1902 when the Saco & Pettee Machine Shop was constructed. In 1922, the existing Mill Building was constructed over the western course of the Saco River, connecting the building to the Saco & Pettee Machine Shop building. Both buildings were utilized as a Machine Shop for the Saco-Lowell complex. In 1963, the former Saco & Pettee Machine Shop building was destroyed by a fire and machine shop operations subsequently ceased in the Mill Building. In 1965, the Warehouse Building was constructed and the Auto Service Building was constructed in 1972. Since 1965, the Mill Building and Warehouse Building have been utilized for miscellaneous warehouse storage purposes and the Auto Service Building has been occupied by numerous automotive/tire repair businesses.
Commercial (.5) Industry (3)
Hazardous
ID Number (if Applicable): REM02436 Enrolled:


Top of Page