Cleanup Activities
There are no current cleanup activities.
Cleanup/Treatment Implemented:
N
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
On June 25-28, 2019 and July 2, 2019, PM advanced twenty-seven borings (SB-1 through SB-27), and installed nineteen temporary monitoring wells (TMW-7 through TMW-11 and TMW-13 through TMW-27) to a maximum depth of 35 feet bgs to assess the areas of concern identified in PM's February 7, 2019, Phase I ESA. Of the soil target analyte concentrations detected above laboratory MDLs, concentrations of Arsenic, Benzene, Lead, and Naphthalene were detected above the most restrictive EPA MCL based SSLs. Of the soil target analyte concentrations detected above laboratory MDLs, concentrations of Arsenic was identified in soil above the EPA Residential and Industrial Soil RSLs. Of the soil target analyte concentrations detected above laboratory MDLs, concentrations of Arsenic were identified in soil above the MDEQ Unrestricted and Restricted Soil TRGs. Concentrations of the majority of the soil samples collected were reported as below MDLs (or ND). No other soil target analytes detected were above the target levels. Of the groundwater sample concentrations detected above laboratory MDLs, concentrations of Total Arsenic, Total Beryllium, Total Chromium, and Total Lead were identified in soil above the EPA MCL based RSLs. Concentrations of Total Beryllium and Total Lead were detected above the MDEQ Groundwater TRGs. The dissolved levels of Arsenic, Barium, Lead, and Mercury were below the EPA MCL-based RSLs and MDEQ Groundwater TRGs. No other groundwater target analytes detected were above the laboratory MDLs
Address of Data Source:
Total ACRES Cleaned Up: 87
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding:
Leveraged Funding:
Cost Share Funding:
Total Funding:
Top of Page