Gonic Sawmill Dam
241131
28 Church Street and 17 Quaker Lane ROCHESTER, NH 03839
27.97
43.273271 / -70.979603
1
McKeown, Amy
McKeown.AmyJean@epa.gov
617-918-1248


Top of Page


Property Location



Top of Page


Property Progress


Top of Page


CAs Associated with this Property

CA NameCA #StateTypeAnnouncement Year
Strafford Regional Planning Commission BF00A00005NHAssessment2015


Top of Page


Assessment Activities at this Property

ActivityEPA FundingStart DateCompletion DateCAAccomplishment Counted?Counted When?
Cleanup Planning$5,928.0011/20/201809/18/2019Strafford Regional Planning Commission YFY20


Is Cleanup Necessary? Yes
EPA Assessment Funding: $5,928.00
Leveraged Funding:
Total Funding: $5,928.00


Top of Page


Contaminants and Media


Ground Water
Soil
NOT Cleaned up
NOT Cleaned up

Cleanup Activities

There are no current cleanup activities.


Cleanup/Treatment Implemented:
Cleanup/Treatement Categories:
Addl Cleanup/Treatment info:
Address of Data Source:
Total ACRES Cleaned Up: 27.97
Number of Cleanup Jobs Leveraged:
EPA Cleanup Funding:
Leveraged Funding:
Cost Share Funding:
Total Funding:


Top of Page


Institutional and Engineering Controls

No
No


Top of Page


Redevelopment and Other Leveraged Accomplishments

There are no current redevelopment activities.


Number of Redevelopment Jobs Leveraged:
Actual Acreage of Greenspace Created:
Leveraged Funding:


Top of Page


Additional Property Attributes

The Gonic Sawmill Dam is slated for removed by the NHDES' Coastal Program

Former Use: The Site is comprised of approximately 27.97 acres across two of the three lots in the Gonic Mills Complex. Lot 1 (5.27 acres) is improved with the original Gonic Mill building, constructed sometime prior to 1951. The Site parcels (Lot 2, 19.64 acres, and Lot 3, 8.33 acres) are separated by the Cocheco River which runs generally north to south. Based on 2018 aerial imagery and prior environmental reports, both lots are primarily woodland, with the exception of a paved parking lot in the northern portion of Lot 2. No buildings are currently located at the Site; however, building debris (e.g., metal, glass, and brick) and concrete/brick foundations remain on Lot 3 from a former sawmill that burned down circa 1942. In addition, evidence of former dumping activities that reportedly occurred between the 1950s and 1960s can be observed in the general center of Lot 3, centered around the northern portion of the former power canal that runs from north to south through the general center of the parcel. An unpaved road is located on the western side of Lot 2 running from north to south leading to a cleared area in the southwest portion of the parcel. Lot 2 has historically remained undeveloped with the exception of the paved parking lot that was constructed sometime prior to 1951, likely to support expansion of the adjacent Gonic Mill operations on Lot 1. The GD was constructed in 1935, also to support Gonic Mill operations on Lot 1.
Industry (27.97)
Petroleum